Case: Hazel McCallion Campus

Project Description: Hazel McCallion Campus Building in Mississauga, occupies 159,000 sq ft. This project was a LEED Gold on a fast-track basis under the government KIP program and on a design-build format. With a construction value of $35,000,000 the project was completed in 16 months. Pact Engineering was the “Compliance Mechanical/Electrical” consultant and the “Commissioning Consultant” for the project.

Client: Sheridan College Institute of Technology & advanced learning
Consultant: RDH Architects
Contract Type: Design-Build
Compliance Engineers: Pact Engineering
LEED Commissioning: Pact Engineering
Project Value: $31,000,000
ConsultProject Size: R155,000 sq ft
Duration: 16 months
LEED Certification Level: Gold