Case: Hazel McCallion Campus
Project Description: Hazel McCallion Campus Building in Mississauga, occupies 159,000 sq ft. This project was a LEED Gold on a fast-track basis under the government KIP program and on a design-build format. With a construction value of $35,000,000 the project was completed in 16 months. Pact Engineering was the “Compliance Mechanical/Electrical” consultant and the “Commissioning Consultant” for the project.
Client: | Sheridan College Institute of Technology & advanced learning |
Consultant: | RDH Architects |
Contract Type: | Design-Build |
Compliance Engineers: | Pact Engineering |
LEED Commissioning: | Pact Engineering |
Project Value: | $31,000,000 |
ConsultProject Size: | R155,000 sq ft |
Duration: | 16 months |
LEED Certification Level: | Gold |