HRC B44 & B45 New Heating Plants
Map Data: © 2021 Google
Project Description: The Huronia Regional Centre (HRC) is a landmark facility on a prominent 107-hectare site. The site contains 50 buildings, ranging in age from the mid-19th to the late 20th century. A centralized steam plant provides heating into HRC site. The steam boilers in the steam plant are in poor condition and requires extensive maintenance to keep it operable. Therefore one of the incentive to decentralize the heat generating plant is to avoid such concern.
Buildings B44 and B45 projects have been initiated to decommission of the existing steam heating system and setup of multiple hydronic and de-centralized heating plants in these buildings, based on the recent Heating Plant study.
Client: | | Infrastructure Ontario (IO) | | Colliers Project Leaders | | CBRE | |
Location: | Orillia |
Start-Date | Aug 2018 |
Completion-Date | Feb 2020 |
Construction Budget: | $1,200,000 |
General Contractor: | Civil Underground & Excavation Company |
Design/Compliance Consultant: | FxD Performance |
Commissioning Consultant: | Pact Engineering |