St John Paul II CSS, Replacement of the Boilers and BAS Upgrades
Image capture: Sep 2020 © 2021 Google
Project Description: St. John Paul II Catholic Secondary School in Scarborough occupies 160,000+ sq ft. This project was to upgrade the building automation system and renew heating plant based on the forensic study on BAS and HVAC systems by Pact Engineering.
Client: | Toronto Catholic District School Board |
Location: | Toronto |
Start-Date | Apr 2019 |
Completion-Date | Jan 2021 |
Project Size: | 160,000 + sq ft |
General Contractor: | Pipe All Plumbing and Heating |
Design/Compliance Consultant: | SAB Engineering |
Commissioning Consultant: | Pact Engineering |